Mar 012014
 

I took this picture after a long mission to get into the Sagrada Familia without waiting on line. It involved saying “screw waiting on this line” and having the best tapas I’ve ever had at a place called Tapas 24, or 21. I don’t remember the number too well.

I’d normally be annoyed by having cranes and scaffolding in a picture, but it is very much part of the interesting things about this monument as it’s been under construction for such a long time.

la sagrada familia, Barcelona from the park with pond and cranes still under construction no tourists no people blocking view

  3 Responses to “Work in progress, La Sagrada Familia”

  1. Our gutter maintenance service is offered at
    competitively low prices in and around North London, Greater London and the South East.

  2. Pairing insulation with an effective VCL, airtight detailing, compatible membranes, and flashings means the whole system works
    as one.

  3. Healthcare practitioners should familiarise themselves with the information in the Green Book chapter
    before offering shingles vaccination.

Leave a Reply to roofing Cancel reply

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

(required)

(required)